
Add to Cart
Heavy Equipment Bucket Wheel Dredger for River Dredging
1.Heavy Equipment Bucket Wheel Dredger Company Introduction
China reliable heavy equipment bucket wheel dredger supplier Weifang Jin Meng Dredger Co.,Ltd., the factory is located in Qingzhou, Weifang City and Shandong Province, is a manufacturer for bucket wheel dredger, which is specialized in heavy equipment bucket wheel dredger researching, designing, production and sales. At the same time is in the strategic cooperation with well-known heavy equipment bucket wheel dredger design Institute in China. In order to serve customer better,the company set up an import and export department, research institutes, a number of domestic and international offices for after-sales service.
As a reliable heavy equipment bucket wheel dredger manufacturer, Weifang Jin Meng Dredger Co., Ltd. has professional R&D department, CAD drawing design center, quality control department and after-sales service department. Our company has more than over 500 employees, including 5 professional senior engineers on heavy equipment bucket wheel dredger building and researching, 16 designers on machinery construction, 8 engineers on heavy equipment bucket wheel dredger quality inspecting and controlling as well as 10 after-sales service engineers.
Heavy equipment bucket wheel dredger is the main product in bucket wheel type, and is popular recognized by customers for strong technical strength, high quality and easy maintenance.
2. Weifang Jin Meng Heavy Equipment Bucket Wheel Dredger Description
This heavy equipment bucket wheel dredger is a type hydraulic controlled, assembling bucket wheel dredger. It is used for river channel dredging, canal and water storage dredging. The dredging devices are driven by hydraulic, concentrate controlled. The mainheavy equipment bucket wheel dredger body is made up of three pontoons, which can be assembled when dredging. The operator cabin is dismountable,which can lower the height of the dredger when maneuvering and allow theheavy equipment bucket wheel dredger to pass bridges. When theheavy equipment bucket wheel dredger is transported long distance or passing not conjunctive water areas,the heavy equipment bucket wheel dredger body can be dismounted and transported by trucks or trains. The heavy equipment bucket wheel dredger can be fixed with anchor casting pole,trolley.The bucket driving device use lub oil and sealings.
3. Weifang Jin Meng Heavy Equipment Bucket Wheel Dredger Technical Specifications
JMD650 Heavy Equipment Bucket Wheel Dredger | |||
Shijiazhuang Dredging Pump | Dia. Discharge pipe | 650mm | |
Head | 65m | ||
Max. Working capacity | 1100m3/h | ||
Discharge distance | 4000m | ||
Dredging depth | 18m | ||
Diesel Engine | 1885KW | Mitsubishi | |
Hydraulic Auxiliary engine | 522KW | Cummins | |
Emergency Generator | 30KW | WEICHAI | |
Total power | 2437KW | ||
Oil Consumption | 365L/H | ||
Hull Dismension | LOA*W*D | 50m×8.8m×2.5m | |
Hydraulic system | Hydraulic pump | VICKERS America (Joint-venture) | |
Hydraulic Motor | Italy SAI technology(Joint-venture) | ||
Valves | REXROTH Germany (Joint-venture) | ||
Operating system | SIEMENS PLC(Imported from Germany) | ||
Ladder winch | Tension | 200KN | |
Swing winch | Tension | 160KN | |
Bucket wheel head | Crown-like | Φ2200mm | |
Power | 400KW |
4. FAQ for Weifang Jin Meng Heavy Equipment Bucket Wheel Dredger
Do your heavy equipment bucket wheel dredger have a test before ex-factory?
Answer:
Yes, it must be. Each heavy equipment bucket wheel dredger must be tested very well before ex-factory so that can guarantee heavy equipment bucket wheel dredger performance at customers' working sites and save the time and cost for customers. Before test we will send invitation letters to the clients to invite them come and do the performance inspection by themselves, after get the clients permission and the heavy equipment bucket wheel dredger will be transported to the port for loading.
What kind of service will supply after sales?
Answer:
After heavy equipment bucket wheel dredger arrive at clients' working site, we will send two experienced engineers for heavy equipment bucket wheel dredger body assembly and native workers' training. With the assist of ancillary equipment like excavators and cranes , the heavy equipment bucket wheel dredger assembly can be finished within 10days and training can be in one week.
Heavy equipment bucket wheel dredger factory and workshop
JMD650 26inch heavy equipment bucket wheel dredger working site
Working site installation and training
Please feel free to contact